Specified, Produced and Checked Before It Ships
A sofa fitting only works if its dimensions, finish and movement match the frame around it. This page explains the capability chain we coordinate through the Haining supply base, the checkpoints we apply, and the technical documents you can request.
Six Stages, One Specification
We coordinate these operations through stamping, forming, plating and assembly workshops in the Yangtze River Delta, so all parts in one order are produced against the same brief.
Stamping & forming
Brackets, mounting plates, hinge leaves and connector bodies are stamped from carbon steel or stainless sheet to the agreed plate thickness and hole pattern.
Tube bending & welding
Sofa legs, seat-box frames and pull-out bed frames are formed from steel tube or profile and welded, with fixing points positioned for the mating parts.
Spring forming
Zigzag springs, edge wire, clips and collated staples are formed from high-tensile spring wire, cut to frame width or supplied in continuous coil.
Surface treatment
Zinc plating, black electrophoretic coating, powder coating, chrome, brushed nickel and antique brass are specified consistently across visible metal parts.
Assembly & kitting
Matched left / right hinge sets, motion linkages and per-sofa fixing kits are assembled and counted before packing to simplify your line.
Inspection & packing
Dimensional, finish and function checks are applied before cartons are sealed, counted and palletised for export.
Capability descriptions refer to the processes available through our supplier network, not to in-house machinery owned by the legal entity. Specific processes, tolerances and test regimes are confirmed per part before quotation.
One Finish Across the Visible Parts
Mixed plating batches are one of the most common complaints in sofa hardware. Because we supply legs, brackets, hinges and handles together, the finish can be specified once and matched across every visible metal part in the set.
| Material group | Typical parts | Options |
|---|---|---|
| Carbon steel sheet | Brackets, mounting plates, hinge leaves, connectors | 2.0–5.0 mm, stamped / welded |
| Stainless steel | Legs, glides, screws, humid-climate fixings | Plated or brushed |
| High-tensile spring wire | Zigzag springs, edge wire, clips, hog rings | 2.8–4.5 mm, cut or coil |
| Zinc alloy / ABS | Handles, leg caps, decorative fittings | Chrome, satin, black |
| Steel tube & profile | Seat-box frames, sofa-bed frames, legs | Welded or bolt-together |
Surface finish options
Finish availability is confirmed per part and per order. Colour matching across batches is specified before production.
Five Checkpoints Before Dispatch
The checks applied to an order depend on the part type. Moving assemblies are function-tested; consumables are checked for gauge, count and feed consistency.
Technical Data Available on Request
Tell us which documents your purchasing or quality team requires and we will include them in the quotation and shipment file.
One Shipment, Many Part Types
Consolidating a full hardware set into one shipment is the main reason customers work with a full-range supplier. It reduces freight, receiving work and the risk of a missing small part stopping the assembly line.
- Carton + pallet export packing, counts checked per carton
- Custom labels, carton marks and logo where required
- Mixed-item consolidation across all eight hardware groups
- Per-sofa fixing kits packed to a counted bill of materials
- Knock-down frame options to reduce shipping volume
Confirm before production
Drawing, tolerances, material, finish, thread standard, load class, packing and label text are all confirmed in writing before an order enters production. If a figure cannot be verified for your specific part, we will say so rather than publish a placeholder.
Send us the part. We will confirm the specification.
Drawing, sample photo, dimensions, finish and estimated quantity are enough to start. We reply with the confirmed specification, price and lead time.